News

27.12.2013

eolotec at the Annual Event 2014

Vistit us at EWEA Annual Event 2014 in Barcelona

more >

18.03.2013

eolotec at the HMI 2013

Vistit us at the HMI 2013 on the eolotec booth.

more >

13.02.2013

eolotec joined BWE

eolotec joined the German Wind Energy Association (BWE)

more >

Head Slider 1
Head Slider 2
Head Slider 3
Head Slider 4 1
Head Slider 5 1
Head Slider 6 1
Head Slider 7 1
1 2 3 4 5 6 7

Konstruktionspraxis Vorspannungsmesssystem

"Interview with Wolfgang Losert on WindEnergy 2014"tl_files/content/Aktuelles/Veroeffentlichung/Konstruktionspraxis Interview.JPG

Premesy – Preload measurement system

Link to the publication: Konstruktionspraxis
Unfortunately this publication is released in German language.
(If you need an English version please contact us under info@eolotec.com)]

 

Konstruktionspraxis Interview with Wolfgang Losert

"Interview with Wolfgang Losert on WindEnergy 2014"tl_files/content/Aktuelles/Veroeffentlichung/Konstruktionspraxis Interview.JPG

Premesy – Preload measurement system

 

 

Video

Konstruktion September 2014

"Higher reliability with preload measurement system"

tl_files/content/Aktuelles/Veroeffentlichung/Titelblatt Konstruktion_1409.JPG

Since the wind turbines reached the multi-megawatt class the mechanical engineering has a central theme: Which rotor solution is the most reliable?  The following article describes how bearing manufacturer can solve this problem.

Unfortunately this publication is released in German language.
(If you need an English version please contact us under info@eolotec.com )

Link to the publication: KON-Eolotec-25-07-14.pdf

 

 

 

 

Nürnberger Nachrichten July 2014

tl_files/content/Aktuelles/Veroeffentlichung/NN_Artikel IHK_28072014.JPG"Light-weight bearings - strong in the business"

Klaus Leonhard

Founder of eolotec GmbH will conquer the wind turbine market – Business idea won the IHK award

 

Link to the publication: NN_Artikel IHK_Juli 2014

 

Wind-Kraft-Journal April 2014

tl_files/content/Aktuelles/Veroeffentlichung/Wind Kraft Journal April Frontbild 2014.jpg"Measurement system for the perfect preload"

Wolfgang Losert/Mathias Pick eolotec GmbH

In the last few years preload bearing systems established on the market. These systems includes many benefits, but also challenges.

Unfortunately this publication is released in German language.
(If you need an English version please contact us under info@eolotec.com )

 

Den Beitrag finden Sie unter: Wind-Kraft-Journal April 2014

 

Wind-Kraft-Journal January 2014

tl_files/content/Aktuelles/Veroeffentlichung/Wind-Kraft_01.2014_1.jpg"Why the up scaling of main bearing is not possible"

Wolfgang Losert/Mathias Pick eolotec GmbH

In the last few years the development of main bearing concepts are dominated of scaling up existing concepts. What are the risks and challenges of this development? What will be the bearing weights and the cost of the available bearing concepts? …..

Link to the publication: Wind-Kraft-Journal January 2014
Unfortunately this publication is released in German language.
(If you need an English version please contact us under info@eolotec.com )

Wind-Kraft-Journal October 2013

tl_files/content/Aktuelles/1121_001.jpg

Modular Main Bearing Concepts

Wolfgang Losert eolotec GmbH

In the last few years the development of main bearing concepts are dominated of scaling up existing concepts. These scaled concepts have large bearing with high weight and/or to new technical challenges during operation.   

Link to the publication: Wind-Kraft-Journal Oktober 2013
Unfortunately this publication is released in German language.
(If you need an English version please contact us under info@eolotec.com )

 

ke NEXT Fokus Wind October 2013

tl_files/content/Aktuelles/ke_next_wind-10-2013.jpg

Clever Supported
The Main Bearing Unit as new Solution

Mathias Pick eolotec GmbH

For direct drive wind turbines the generator bearing are a real challenge for large wind turbines. The engineering team of eolotec has developed a new bearing concept what is not only the generator bearing but also the main bearing. This solution promise a plenty of benfits……      

Link to the publication: ke NEXT im Fokus October 2013
Unfortunately this publication is released in German language.
(If you need an English version please contact us under info@eolotec.com


Konstruktionspraxis Special edition wind power, April 2013

tl_files/content/Download/Logo/Konstruktionspraxis_logo.jpg

Bearing Unit as ready to mount Solution

Mathias Pick eolotec GmbH

Where once there were main bearings with 0,87m diameter and 0,5 tons for 1,5MW there now are main bearings  for 5MW with 3,2m and more than 7 tons…….

Link to the publication: Konstrutkionspraxis April 2013
Unfortunately this publication is released in German language.
(If you need an English version please contact us under info@eolotec.com)