Main Bearing Unit for a 3MW direct drive wind turbine
Read the report on the activation of the P-3000-turbine: WINDPOWERMontly
- Development and manufacturing support for a main and generator bearing unit for a 3MW permanent magnet
- Back to back-test run of the generator including the MBU at Q1/2013
- Placing into operation of two prototypes at Q3/2013
Weitere Bilder: