Main Bearing Unit for a 3MW direct drive wind turbine

Read the report on the activation of the P-3000-turbine: WINDPOWERMontly

  • Development and manufacturing support for a main and generator bearing unit for a 3MW permanent magnet
  • Back to back-test run of the generator including the MBU at Q1/2013
  • Placing into operation of two prototypes at Q3/2013

Weitere Bilder:

Latest References & Projects

Optimization of critical Blade Bearings

Read more

Wind farm with high demands relies on MBU2500TV

Read more